top of page

PROJECTS

Empower
Growth

St Andrews Hospital
 

St Andrews Hospital has almost completed their new Eastern Clinical Development (ECD) Building.

Built Water Solutions was engaged to create a Water Provider Risk Management Plan to register them as a water provider including hydraulic schematic drawings specifically for the registration process. St Andrews Hospital will be treating their incoming mains water via filtration, water softening into a holding tank that is then circulated and chlorinated via a Prominent Chlorination and pH management system, this chlorinated cold water is then circulated throughout the building minimising water stagnation and ensuring that chlorinated water is always available at the outlets, this design by System Solutions Engineering should be "the standard" for potable water system design in all high risk buildings.

Canberra Hospital
 

We have been working closely with Canberra Hospital to create all new Water Risk Management Plans for their main buildings, carry out scheduled disinfection's and build bespoke chlorination plants for their buildings.

We are also supporting the hospital as their water SME and creating documentation to manage their hydraulic assets.

bottom of page